About we-on
group
Services
can do
Projects
We've done
Team
Careers
Career
Work
BIM
Technology
Blog
News
Contacts
Write to us
info@we-on.com
CN
EN
VK
Telegram-channel
YouTube
Linkedin
Instagram
info@we-on.com
marketing@we-on.com
press@we-on.com
+7 (495) 741-17-22
CN
EN
VK
Telegram-channel
YouTube
Linkedin
Instagram
info@we-on.com
marketing@we-on.com
press@we-on.com
+7 (495) 741-17-22
CN
EN
Close
Contacts
write to us
CN
EN
info@we-on.com
Menu
Navigation
Найти:
Страницы
About
Accessibility provisions
Analytics and import substitution of facility equipment with the creation of an up-to-date BIM model
Analytics and import substitution of facility equipment with the creation of an up-to-date BIM model
Architectural concepts (3D modeling and rendering)
Architectural solutions
AUPS (Architectural and Urban Planning Solution)
BIM
Career
Civil defence engineering measures Emergency prevention measures
Construction management plan
Construction traffic management plan
Contacts
Cookie Agreement
D (Design Documentation)
DD (Detailed Design)
Design by LEED and BREEAM Standards
Designer supervision with the creation of an executive BIM model
Designer supervision with the creation of an executive BIM model
Development of Engineering Structures Monitoring (SMIC)
Development of Engineering Systems Monitoring (SMIS)
Development of objects BIM-model
Development of project-specific technical specifications (STU)
Development of Protective Deratization System
Development of System for Communication and Control in Crisis Situation (SUKS)
Development of System for Communication and Control in Crisis Situation (SUKS)
Energy Efficiency Section
Energy-efficiency measures
Engineering and environmental surveys
Engineering and geodetic surveys
Engineering and geological surveys
Engineering surveys
Expert examination of BIM model
Fire safety measures
Front End Engineering Design
General Designer’s Services
General plan
Heating, ventilation and air conditioning systems
Land plot layout diagram
Land plot layout diagram
Landscaping concept
Low-current systems (Fire alarm, security systems, communication systems)
Master plan concepts and landscaping
MEP systems
Non-governmental expert examination of engineering survey results
Non-governmental expert examination of engineering survey results
Non-governmental expert examination of estimated documentation
Non-governmental expert examination of project documentation
Operational traffic management plan
Power supply and electric lighting systems
Pre-project surveys
Preparation of a set of executive documentation for obtaining a Statement of Conformity
Preparation of a set of executive documentation for obtaining a Statement of Conformity
Projects
Requirements for safe operation of capital construction facilities
Services
Special engineering systems
Structural solutions
Support for obtaining the Building Permit
T (Tender Documentation)
Team
Technical audit of design documentation
Technological engineering
Technological solutions
Terms for the use of site materials
The project of capital construction facilities demolition/dismantling works
Water supply, drainage and automatic fire extinguishing systems
Главная
Документы
Архивы
Март 2022
Декабрь 2021
Сентябрь 2021
Август 2021
Июнь 2021
Рубрики
Mass Media about us
(3)
Сompany's news
(4)
Мета
Войти
We use cookies to provide you with more opportunities when using the site.
Cookies Agreement
OK